Survey-first drilling
Resistivity profiling before the rig arrives — fewer dry holes, honest depth estimates.

Zanzibaba lists borehole drilling options for Zanzibar projects. Select the required scope, send your site location and dimensions, and request a written quotation confirming materials, installation, exclusions and delivery timing.
| Catalogue fact | Recorded value | Before ordering |
|---|---|---|
| Service categories | 6 | Select the relevant category below |
| Listed designs / service options | 11 | Confirm the design code and final specification |
| Pricing basis | Project quotation | Confirm currency, taxes, transport and installation |
These counts describe this catalogue, not stock or completed projects. Product descriptions are planning references; a written quotation and approved specification determine the supplied scope. Review pricing assumptions before comparing proposals.
Product Catalogue
Browse 6 published borehole drilling categories, then select a design or service option for a written project quotation.
| Category | Catalogue section |
|---|---|
| Survey & Permits | View listed options |
| Drilling | View listed options |
| Pumps | View listed options |
| Storage & Treatment | View listed options |
| Filtration Tie-In | View listed options |
| Maintenance | View listed options |
Choose an option by its design reference. Confirm dimensions, specification and availability in writing; category listings do not imply every configuration is suitable for every site.
Swipe to see more
Know before you drill
Survey & Permits options include Hydrogeological Survey, Drilling Permit Support. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Hydrogeological Survey (BD-001) | Scientific groundwater survey — resistivity profiling, site selection and expected depth/yield report before you spend on drilling. | Resistivity Profile; Yield Estimate; Water Quality Pre-check |
| Drilling Permit Support (BD-002) | Permit and documentation support for groundwater abstraction — applications, environmental notes and compliance paperwork handled. | Permit Application; EIA Notes; Abstraction Licence |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
The borehole itself
Drilling & Yield options include Borehole Drilling & Casing, Test Pumping & Yield Analysis, Borehole Rehabilitation. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Borehole Drilling & Casing (BD-003) | Rotary borehole drilling with steel/UPVC casing, gravel pack and sanitary seal — drilled to stable yield through Zanzibar's coral and sand geology. | Steel Casing; UPVC Casing; Gravel Pack; Sanitary Seal |
| Test Pumping & Yield Analysis (BD-004) | Step-drawdown test pumping with recovery analysis — certified yield report sizing your pump, tank and daily supply with confidence. | 4-Hour Test; 24-Hour Test; Yield Certificate |
| Borehole Rehabilitation (BD-005) | Revive low-yield or silted boreholes — camera inspection, air-lift cleaning, re-development and pump reset without re-drilling. | Camera Inspection; Air-Lift Cleaning; Pump Reset |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Bring it to the surface
Pumps & Pressure options include Submersible Pump Installation, Solar Pump System, Booster & Pressure Set. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Submersible Pump Installation (WP-001) | Correctly-sized submersible pumps with dry-run protection, cable and drop pipe — matched to your tested yield and head height. | AC Pumps; Dry-Run Protection; Hotel Duty |
| Solar Pump System (WP-002) | Solar-direct pumping with battery-free daytime supply — panels, controller and pump sized for off-grid plots and low running cost. | Solar-Direct; Hybrid Backup; Off-Grid |
| Booster & Pressure Set (WP-003) | Pressure booster sets with vessels and automatic control — steady taps and showers across multi-storey villas and hotel blocks. | Single Pump; Duty-Standby; VSD Control |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Store it safely
Storage, Treatment & Care options include Storage Tanks & Towers, Filtration + RO Tie-In, Service & Maintenance Plan. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Storage Tanks & Towers (WS-001) | Food-grade storage tanks on steel or masonry towers — 1,000 to 20,000+ litres with first-flush, overflow and level control. | 1k–5k Litres; 10k+ Litres; Tower + Tank |
| Filtration + RO Tie-In (WS-002) | Connect borehole water to filtration and reverse-osmosis — sediment, iron and salinity handled for safe drinking water. | Sediment + Carbon; Iron Removal; RO Drinking |
| Service & Maintenance Plan (WS-003) | Scheduled borehole servicing — pump checks, water testing, chlorination, tank cleaning and breakdown response across Unguja. | Quarterly Service; Hotel Contract; Breakdown Cover |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Compare written scopes before comparing totals. A supply-only proposal and an installed system answer different requirements. Use the same quantities, specification, delivery location and acceptance criteria for every quotation; ask each bidder to identify exclusions.
| Comparison gap | Evidence to request | Decision rule |
|---|---|---|
| Different quantities | Measured schedule and units | Match dimensions, counts and units |
| Different materials | Named model, grade or finish | Compare the same approved specification |
| Missing installation | Supply / install responsibility schedule | Identify labour, access and making good |
| Unclear delivery | Destination, freight and delivery programme | Confirm site access and unloading responsibility |
| Unclear handover | Inspection, testing and warranty terms | Agree acceptance evidence before ordering |
For phased works, list each mobilisation and the interface with other trades. For replacement work, identify removal and disposal. For imported or custom products, confirm approved drawings, order lead time and substitution rules before payment. These requirements belong in the quotation; they are not automatic inclusions.
One package
This package lists 12 scope items. Use the schedule below to request an itemised quotation; inclusion and quantities require written confirmation.
| Listed item | Order requirement |
|---|---|
| Hydrogeological Survey | Confirm quantity, specification and inclusion in the quotation |
| Borehole Drilling | Confirm quantity, specification and inclusion in the quotation |
| Test Pumping | Confirm quantity, specification and inclusion in the quotation |
| Submersible Pump | Confirm quantity, specification and inclusion in the quotation |
| Solar Pumping Option | Confirm quantity, specification and inclusion in the quotation |
| Storage Tanks | Confirm quantity, specification and inclusion in the quotation |
| Booster Set | Confirm quantity, specification and inclusion in the quotation |
| Filtration | Confirm quantity, specification and inclusion in the quotation |
| RO Drinking Water | Confirm quantity, specification and inclusion in the quotation |
| Auto Level Control | Confirm quantity, specification and inclusion in the quotation |
| Chlorination | Confirm quantity, specification and inclusion in the quotation |
| Maintenance Plan | Confirm quantity, specification and inclusion in the quotation |
Review each line against the measured project scope. Specify substitutions and exclusions before approval; a package label alone does not define the installed system.
Why drill with us
Hotels run at 89% occupancy — a dry tank means cancelled rooms. We engineer supply with margin, backup and monitoring.
Resistivity profiling before the rig arrives — fewer dry holes, honest depth estimates.
Test pumping with a written yield report, so pumps and tanks are sized to facts.
Pumps that run on sun with grid backup — low bills even when ZECO cuts power.
Duty-standby pumps, auto changeover and level alarms for properties that cannot stop.
Components
Listed finish choices include Steel Casing, Submersible Pump, Solar Array, Storage Tank. Confirm the finish reference and suitability with your selected product specification.
| Finish | Approval requirement |
|---|---|
| Steel Casing | Confirm physical sample or manufacturer reference |
| Submersible Pump | Confirm physical sample or manufacturer reference |
| Solar Array | Confirm physical sample or manufacturer reference |
| Storage Tank | Confirm physical sample or manufacturer reference |
| Pressure Vessel | Confirm physical sample or manufacturer reference |
| Media Filter | Confirm physical sample or manufacturer reference |
| RO Membrane | Confirm physical sample or manufacturer reference |
| UV Steriliser | Confirm physical sample or manufacturer reference |
Screen colours are references for selection. Record the approved colour, texture and product compatibility in the order; confirm any exposure restrictions and maintenance conditions from the supplier documentation.
Swipe to see more
Our process
The published workflow has 4 stages: Survey & quote, Permits & drilling, Test & equip. Agree the deliverables and approvals for your project before work starts.
| Stage | Step |
|---|---|
| 1 | Survey & quote |
| 2 | Permits & drilling |
| 3 | Test & equip |
| 4 | Treat & maintain |
Use the detailed steps to agree who approves each deliverable. Establish project dates separately; a workflow stage is not a guaranteed delivery duration.
We visit, run resistivity lines and quote depth, yield expectation and full system cost.
Paperwork handled, rig mobilised, borehole drilled, cased and developed.
Test pumping certifies yield; pump, solar, tanks and controls installed to match.
Filtration/RO commissioned, water tested, and a service plan keeps it flowing.
Questions
Direct answers for property owners planning this service in Zanzibar.
It depends on expected depth, coral and sand geology, casing type, pump size, storage tanks and any filtration or RO needed. We confirm the exact scope and fixed quotation after a free site visit.
It depends on survey results, permit paperwork, ground conditions and the size of the pump, tank and treatment system. We confirm the work sequence and schedule after a free site visit.
Yes. We support permit applications, environmental notes and abstraction documentation as part of the survey and drilling package.
It depends on laboratory test results — sediment, iron and salinity are common in Zanzibar groundwater. We tie the borehole into sediment, carbon, UV or RO treatment matched to your water test.
Not if the system is designed for it. We install solar-direct or hybrid pumping with storage tanks and auto level control, so daytime supply continues and stored water bridges the outage.
Last updated: 2026-09-30.
Keep exploring
Frequently combined with this service on the same property.
Let us engineer hotel-grade supply — redundancy, storage days and quality your guests trust.
Get a free survey visit and quotation for borehole drilling, pumping, storage and treatment in Zanzibar.