Skip to content
Zanzibaba.Project Solutions
Borehole drilling and water supply in Zanzibar
Water independence

Your own reliable water in Zanzibar.

Zanzibaba lists borehole drilling options for Zanzibar projects. Select the required scope, send your site location and dimensions, and request a written quotation confirming materials, installation, exclusions and delivery timing.

Borehole Drilling: published catalogue scope
Catalogue factRecorded valueBefore ordering
Service categories6Select the relevant category below
Listed designs / service options11Confirm the design code and final specification
Pricing basisProject quotationConfirm currency, taxes, transport and installation

These counts describe this catalogue, not stock or completed projects. Product descriptions are planning references; a written quotation and approved specification determine the supplied scope. Review pricing assumptions before comparing proposals.

Explore Services

Product Catalogue

Explore Our Borehole Drilling Range

Browse 6 published borehole drilling categories, then select a design or service option for a written project quotation.

Published service categories
CategoryCatalogue section
Survey & PermitsView listed options
DrillingView listed options
PumpsView listed options
Storage & TreatmentView listed options
Filtration Tie-InView listed options
MaintenanceView listed options

Choose an option by its design reference. Confirm dimensions, specification and availability in writing; category listings do not imply every configuration is suitable for every site.

Swipe to see more

Know before you drill

Survey & Permits

Survey & Permits options include Hydrogeological Survey, Drilling Permit Support. Compare the listed design references and requirements below before requesting a project-specific quotation.

Survey & Permits: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Hydrogeological Survey (BD-001)Scientific groundwater survey — resistivity profiling, site selection and expected depth/yield report before you spend on drilling.Resistivity Profile; Yield Estimate; Water Quality Pre-check
Drilling Permit Support (BD-002)Permit and documentation support for groundwater abstraction — applications, environmental notes and compliance paperwork handled.Permit Application; EIA Notes; Abstraction Licence

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

The borehole itself

Drilling & Yield

Drilling & Yield options include Borehole Drilling & Casing, Test Pumping & Yield Analysis, Borehole Rehabilitation. Compare the listed design references and requirements below before requesting a project-specific quotation.

Drilling & Yield: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Borehole Drilling & Casing (BD-003)Rotary borehole drilling with steel/UPVC casing, gravel pack and sanitary seal — drilled to stable yield through Zanzibar's coral and sand geology.Steel Casing; UPVC Casing; Gravel Pack; Sanitary Seal
Test Pumping & Yield Analysis (BD-004)Step-drawdown test pumping with recovery analysis — certified yield report sizing your pump, tank and daily supply with confidence.4-Hour Test; 24-Hour Test; Yield Certificate
Borehole Rehabilitation (BD-005)Revive low-yield or silted boreholes — camera inspection, air-lift cleaning, re-development and pump reset without re-drilling.Camera Inspection; Air-Lift Cleaning; Pump Reset

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Bring it to the surface

Pumps & Pressure

Pumps & Pressure options include Submersible Pump Installation, Solar Pump System, Booster & Pressure Set. Compare the listed design references and requirements below before requesting a project-specific quotation.

Pumps & Pressure: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Submersible Pump Installation (WP-001)Correctly-sized submersible pumps with dry-run protection, cable and drop pipe — matched to your tested yield and head height.AC Pumps; Dry-Run Protection; Hotel Duty
Solar Pump System (WP-002)Solar-direct pumping with battery-free daytime supply — panels, controller and pump sized for off-grid plots and low running cost.Solar-Direct; Hybrid Backup; Off-Grid
Booster & Pressure Set (WP-003)Pressure booster sets with vessels and automatic control — steady taps and showers across multi-storey villas and hotel blocks.Single Pump; Duty-Standby; VSD Control

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Store it safely

Storage, Treatment & Care

Storage, Treatment & Care options include Storage Tanks & Towers, Filtration + RO Tie-In, Service & Maintenance Plan. Compare the listed design references and requirements below before requesting a project-specific quotation.

Storage, Treatment & Care: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Storage Tanks & Towers (WS-001)Food-grade storage tanks on steel or masonry towers — 1,000 to 20,000+ litres with first-flush, overflow and level control.1k–5k Litres; 10k+ Litres; Tower + Tank
Filtration + RO Tie-In (WS-002)Connect borehole water to filtration and reverse-osmosis — sediment, iron and salinity handled for safe drinking water.Sediment + Carbon; Iron Removal; RO Drinking
Service & Maintenance Plan (WS-003)Scheduled borehole servicing — pump checks, water testing, chlorination, tank cleaning and breakdown response across Unguja.Quarterly Service; Hotel Contract; Breakdown Cover

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Why the lowest headline price can be the wrong comparison

Compare written scopes before comparing totals. A supply-only proposal and an installed system answer different requirements. Use the same quantities, specification, delivery location and acceptance criteria for every quotation; ask each bidder to identify exclusions.

Five checks for equivalent quotations; this is a buying checklist, not a competitor performance study
Comparison gapEvidence to requestDecision rule
Different quantitiesMeasured schedule and unitsMatch dimensions, counts and units
Different materialsNamed model, grade or finishCompare the same approved specification
Missing installationSupply / install responsibility scheduleIdentify labour, access and making good
Unclear deliveryDestination, freight and delivery programmeConfirm site access and unloading responsibility
Unclear handoverInspection, testing and warranty termsAgree acceptance evidence before ordering

For phased works, list each mobilisation and the interface with other trades. For replacement work, identify removal and disposal. For imported or custom products, confirm approved drawings, order lead time and substitution rules before payment. These requirements belong in the quotation; they are not automatic inclusions.

One package

Complete Water Independence

This package lists 12 scope items. Use the schedule below to request an itemised quotation; inclusion and quantities require written confirmation.

Published package checklist
Listed itemOrder requirement
Hydrogeological SurveyConfirm quantity, specification and inclusion in the quotation
Borehole DrillingConfirm quantity, specification and inclusion in the quotation
Test PumpingConfirm quantity, specification and inclusion in the quotation
Submersible PumpConfirm quantity, specification and inclusion in the quotation
Solar Pumping OptionConfirm quantity, specification and inclusion in the quotation
Storage TanksConfirm quantity, specification and inclusion in the quotation
Booster SetConfirm quantity, specification and inclusion in the quotation
FiltrationConfirm quantity, specification and inclusion in the quotation
RO Drinking WaterConfirm quantity, specification and inclusion in the quotation
Auto Level ControlConfirm quantity, specification and inclusion in the quotation
ChlorinationConfirm quantity, specification and inclusion in the quotation
Maintenance PlanConfirm quantity, specification and inclusion in the quotation

Review each line against the measured project scope. Specify substitutions and exclusions before approval; a package label alone does not define the installed system.

Hydrogeological Survey
Borehole Drilling
Test Pumping
Submersible Pump
Solar Pumping Option
Storage Tanks
Booster Set
Filtration
RO Drinking Water
Auto Level Control
Chlorination
Maintenance Plan

Why drill with us

Water you can plan a business on.

Hotels run at 89% occupancy — a dry tank means cancelled rooms. We engineer supply with margin, backup and monitoring.

Survey-first drilling

Resistivity profiling before the rig arrives — fewer dry holes, honest depth estimates.

Certified yield

Test pumping with a written yield report, so pumps and tanks are sized to facts.

Solar-ready

Pumps that run on sun with grid backup — low bills even when ZECO cuts power.

Hotel-grade backup

Duty-standby pumps, auto changeover and level alarms for properties that cannot stop.

Components

System Components

Listed finish choices include Steel Casing, Submersible Pump, Solar Array, Storage Tank. Confirm the finish reference and suitability with your selected product specification.

Published finish references
FinishApproval requirement
Steel CasingConfirm physical sample or manufacturer reference
Submersible PumpConfirm physical sample or manufacturer reference
Solar ArrayConfirm physical sample or manufacturer reference
Storage TankConfirm physical sample or manufacturer reference
Pressure VesselConfirm physical sample or manufacturer reference
Media FilterConfirm physical sample or manufacturer reference
RO MembraneConfirm physical sample or manufacturer reference
UV SteriliserConfirm physical sample or manufacturer reference

Screen colours are references for selection. Record the approved colour, texture and product compatibility in the order; confirm any exposure restrictions and maintenance conditions from the supplier documentation.

Steel borehole casing

Steel Casing

Submersible pump option

Submersible Pump

Solar pump array option

Solar Array

Storage tank option

Storage Tank

Pressure vessel option

Pressure Vessel

Media filter option

Media Filter

RO membrane option

RO Membrane

UV steriliser option

UV Steriliser

Swipe to see more

Our process

From dry plot to flowing taps

The published workflow has 4 stages: Survey & quote, Permits & drilling, Test & equip. Agree the deliverables and approvals for your project before work starts.

Published process stages
StageStep
1Survey & quote
2Permits & drilling
3Test & equip
4Treat & maintain

Use the detailed steps to agree who approves each deliverable. Establish project dates separately; a workflow stage is not a guaranteed delivery duration.

  1. 01

    Survey & quote

    We visit, run resistivity lines and quote depth, yield expectation and full system cost.

  2. 02

    Permits & drilling

    Paperwork handled, rig mobilised, borehole drilled, cased and developed.

  3. 03

    Test & equip

    Test pumping certifies yield; pump, solar, tanks and controls installed to match.

  4. 04

    Treat & maintain

    Filtration/RO commissioned, water tested, and a service plan keeps it flowing.

Questions

Common Questions About Borehole Drilling

Direct answers for property owners planning this service in Zanzibar.

How much does borehole drilling cost in Zanzibar?

It depends on expected depth, coral and sand geology, casing type, pump size, storage tanks and any filtration or RO needed. We confirm the exact scope and fixed quotation after a free site visit.

How long does a borehole project take from survey to flowing taps?

It depends on survey results, permit paperwork, ground conditions and the size of the pump, tank and treatment system. We confirm the work sequence and schedule after a free site visit.

Do you handle drilling permits and paperwork?

Yes. We support permit applications, environmental notes and abstraction documentation as part of the survey and drilling package.

Which treatment does borehole water need before drinking?

It depends on laboratory test results — sediment, iron and salinity are common in Zanzibar groundwater. We tie the borehole into sediment, carbon, UV or RO treatment matched to your water test.

What happens when ZECO cuts power — does the pump stop?

Not if the system is designed for it. We install solar-direct or hybrid pumping with storage tanks and auto level control, so daytime supply continues and stored water bridges the outage.

Last updated: 2026-09-30.

Running a Hotel? Water Is Revenue.

Let us engineer hotel-grade supply — redundancy, storage days and quality your guests trust.

Ready for Your Own Water?

Get a free survey visit and quotation for borehole drilling, pumping, storage and treatment in Zanzibar.