Works during power cuts
ARD rescue plus inverter/solar backup parks the cabin safely at the nearest floor — no trapped guests.

Zanzibaba lists elevator installation options for Zanzibar projects. Select the required scope, send your site location and dimensions, and request a written quotation confirming materials, installation, exclusions and delivery timing.
| Catalogue fact | Recorded value | Before ordering |
|---|---|---|
| Service categories | 5 | Select the relevant category below |
| Listed designs / service options | 11 | Confirm the design code and final specification |
| Pricing basis | Project quotation | Confirm currency, taxes, transport and installation |
These counts describe this catalogue, not stock or completed projects. Product descriptions are planning references; a written quotation and approved specification determine the supplied scope. Review pricing assumptions before comparing proposals.
Product Catalogue
Browse 5 published elevator installation categories, then select a design or service option for a written project quotation.
| Category | Catalogue section |
|---|---|
| Home Lifts | View listed options |
| Hotel & Passenger Lifts | View listed options |
| Shaft & Power | View listed options |
| Modernisation | View listed options |
| Maintenance | View listed options |
Choose an option by its design reference. Confirm dimensions, specification and availability in writing; category listings do not imply every configuration is suitable for every site.
Swipe to see more
Private villas
Home & Villa Lifts options include Panoramic Villa Lift, Home Lift (No Shaft). Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Panoramic Villa Lift (EL-001) | Glass panoramic home lift for multi-storey villas — silent machine-room-less drive, sea-view cabin and soft LED lighting sized for 3–5 stops. | 2–5 Stops; 250–400 kg; Glass Shaft |
| Home Lift (No Shaft) (EL-002) | Self-supporting home lift that needs no concrete shaft — installs against a wall or stairwell void, ideal for retrofits and elderly-accessible living. | No Concrete Shaft; Single-Phase Power; Wheelchair Cabin |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Hotels & apartments
Passenger, Service & Accessibility options include Passenger Hotel Lift, Service / Goods Lift, Stairlift / Accessibility Lift. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Passenger Hotel Lift (EL-003) | Hotel-duty passenger lift for 6–13 persons — VVVF smooth ride, heavy-duty doors and destination-ready controls for apartment blocks and hotels. | 6–13 Persons; VVVF Drive; Hotel Duty Doors |
| Service / Goods Lift (EL-004) | Back-of-house service lift for luggage, housekeeping trolleys and kitchen goods — stainless cabin, bumper rails and high-cycle reliability. | 500–1000 kg; Stainless Cabin; High-Cycle Duty |
| Stairlift / Accessibility Lift (EL-005) | Stairlifts and platform accessibility lifts for stairs, split levels and entrances — dignified elderly access where a full lift shaft is not possible. | Straight & Curved Rails; Platform Lifts; Indoor / Outdoor |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Shaft, power & upgrades
Shaft, Backup Power & Modernisation options include Shaft Construction, ARD & Backup Power Integration, Modernisation of Old Lifts. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Shaft Construction (EL-006) | Lift shaft built by our own team — masonry, structural steel or panoramic glass shafts with pit, headroom and ventilation to manufacturer spec. | Masonry Shaft; Steel Structure; Panoramic Glass |
| ARD & Backup Power Integration (EL-007) | Automatic rescue device plus inverter/solar backup so the lift parks safely at the nearest floor during ZECO power cuts — no trapped passengers. | Auto Rescue Device; Inverter Backup; Solar Tie-In |
| Modernisation of Old Lifts (EL-008) | Modernise tired lifts — new controller, doors, cabin interior and safety gear. Smoother ride, lower power bills and compliant safety at half the cost of replacement. | New Controller; Door Upgrade; Cabin Refit |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Serviced for life
Maintenance & Certification options include Annual Maintenance Contract, Breakdown Cover, Load Testing & Certification. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Annual Maintenance Contract (EL-009) | Scheduled lift servicing — monthly inspections, oil, ropes, door gear and safety checks with a written logbook for insurance and hotel audits. | Monthly Visits; Logbook Reports; Hotel Contracts |
| Breakdown Cover (EL-010) | Priority breakdown response across Unguja — entrapment call-out, fault diagnosis and genuine spares from local stock, not months of waiting. | Entrapment Call-Out; Fault Diagnosis; Local Spares |
| Load Testing & Certification (EL-011) | Annual load testing and safety certification — governor, brakes, buffers and alarms tested and documented for insurers and building compliance. | Full-Load Test; Safety Gear Test; Compliance Certificate |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Compare written scopes before comparing totals. A supply-only proposal and an installed system answer different requirements. Use the same quantities, specification, delivery location and acceptance criteria for every quotation; ask each bidder to identify exclusions.
| Comparison gap | Evidence to request | Decision rule |
|---|---|---|
| Different quantities | Measured schedule and units | Match dimensions, counts and units |
| Different materials | Named model, grade or finish | Compare the same approved specification |
| Missing installation | Supply / install responsibility schedule | Identify labour, access and making good |
| Unclear delivery | Destination, freight and delivery programme | Confirm site access and unloading responsibility |
| Unclear handover | Inspection, testing and warranty terms | Agree acceptance evidence before ordering |
For phased works, list each mobilisation and the interface with other trades. For replacement work, identify removal and disposal. For imported or custom products, confirm approved drawings, order lead time and substitution rules before payment. These requirements belong in the quotation; they are not automatic inclusions.
One package
This package lists 12 scope items. Use the schedule below to request an itemised quotation; inclusion and quantities require written confirmation.
| Listed item | Order requirement |
|---|---|
| Site Survey & Shaft Assessment | Confirm quantity, specification and inclusion in the quotation |
| Shaft Construction | Confirm quantity, specification and inclusion in the quotation |
| Lift Supply | Confirm quantity, specification and inclusion in the quotation |
| Machine-Room-Less Drive | Confirm quantity, specification and inclusion in the quotation |
| VVVF Smooth Control | Confirm quantity, specification and inclusion in the quotation |
| Panoramic or Solid Cabin | Confirm quantity, specification and inclusion in the quotation |
| ARD Rescue Device | Confirm quantity, specification and inclusion in the quotation |
| Backup Power Integration | Confirm quantity, specification and inclusion in the quotation |
| Installation & Commissioning | Confirm quantity, specification and inclusion in the quotation |
| Load Test & Certification | Confirm quantity, specification and inclusion in the quotation |
| Handover Training | Confirm quantity, specification and inclusion in the quotation |
| Annual Maintenance Plan | Confirm quantity, specification and inclusion in the quotation |
Review each line against the measured project scope. Specify substitutions and exclusions before approval; a package label alone does not define the installed system.
Why lift with us
Island power cuts, sea air and hotel duty cycles demand lifts specified for Zanzibar, not catalogues written for Europe.
ARD rescue plus inverter/solar backup parks the cabin safely at the nearest floor — no trapped guests.
MRL drives with VVVF control — smooth, quiet rides with no rooftop machine room to build.
Heavy-duty doors, high-cycle components and service lifts sized for luggage, trolleys and 89% occupancy.
Our own engineers on Unguja with genuine spares in local stock — breakdowns fixed in hours, not months.
Cabin options
Listed finish choices include Glass Panoramic, Brushed Stainless, Mirror Polished, Timber Veneer. Confirm the finish reference and suitability with your selected product specification.
| Finish | Approval requirement |
|---|---|
| Glass Panoramic | Confirm physical sample or manufacturer reference |
| Brushed Stainless | Confirm physical sample or manufacturer reference |
| Mirror Polished | Confirm physical sample or manufacturer reference |
| Timber Veneer | Confirm physical sample or manufacturer reference |
| Stone Floor | Confirm physical sample or manufacturer reference |
| Custom RAL Paint | Confirm physical sample or manufacturer reference |
Screen colours are references for selection. Record the approved colour, texture and product compatibility in the order; confirm any exposure restrictions and maintenance conditions from the supplier documentation.
Swipe to see more
Our process
The published workflow has 4 stages: Survey & shaft assessment, Shaft & preparation, Install & commission. Agree the deliverables and approvals for your project before work starts.
| Stage | Step |
|---|---|
| 1 | Survey & shaft assessment |
| 2 | Shaft & preparation |
| 3 | Install & commission |
| 4 | Maintain & respond |
Use the detailed steps to agree who approves each deliverable. Establish project dates separately; a workflow stage is not a guaranteed delivery duration.
We visit, measure headroom, pit depth and power supply, then specify the right lift and shaft type.
Our team builds or adapts the shaft — masonry, steel or glass — with power and ventilation ready.
Lift installed, ARD and backup integrated, load-tested and certified for handover.
Annual contract with monthly visits, logbook reports and priority breakdown cover.
Questions
Direct answers for property owners planning this service in Zanzibar.
It depends on stops, load, cabin choice and whether a new shaft is needed or a no-shaft retrofit fits. We confirm the exact scope and fixed quotation after a free consultation and shaft assessment.
It depends on shaft construction needs, lift type and power and ventilation readiness. Our sequence — survey, shaft preparation, install and commissioning, then maintenance — locks dates after the site survey.
Yes — every lift is specified for island conditions with an automatic rescue device plus inverter or solar backup, so the cabin parks safely at the nearest floor instead of trapping passengers.
Both. New builds in growth areas like Fumba get masonry, steel or panoramic glass shafts built by our team, while existing villas use self-supporting no-shaft home lifts or stairlifts where a full shaft is not possible.
Yes — annual contracts cover monthly inspections, logbook reports, breakdown response with genuine spares from local stock, plus load testing and safety certification including modernisation of tired lifts.
Last updated: 2026-09-30.
Keep exploring
Frequently combined with this service on the same property.
Let us engineer guest and service lifts — accessibility compliance, luggage flow and uptime your reviews depend on.
Get a free lift consultation and shaft assessment for elevator installation and maintenance in Zanzibar.