Aluminium vs timber windows in Zanzibar: compare specifications before materials
Choose between aluminium and timber windows using the specified frame, finish, glazing, hardware and installation details for each opening. Material name alone does not establish price, service life or coastal suitability. Request equivalent written quotations and model-specific evidence before selecting a system.
| Published option | Budget reference | Evidence limit |
|---|---|---|
| Fixed glass panel | From USD 280 per unit | Dimensions and final specification require quotation |
| Casement window | From USD 320 per unit | Not a verified like-for-like timber comparison |
| Timber equivalent | Project quotation required | No matched timber quotation dataset published here |
Source: Zanzibaba pricing catalogue. These allowances are not a market survey or tested performance dataset. To compare options, use one opening schedule and require each supplier to state the frame, glass, hardware, installation and maintenance scope. Review date: 6 November 2026.
Five gaps a material-only window comparison misses
A material-only comparison cannot establish which complete window meets your project requirements. Compare the same opening sizes and request evidence for exposure, glazing, hardware, installation and maintenance. The checklist below identifies missing specification details; it does not rank suppliers or claim one material always wins.
| Gap | Aluminium proposal | Timber proposal |
|---|---|---|
| Frame definition | Named profile system and finish | Named species, section and finish |
| Glazing | Glass build-up and frame compatibility | Same required glass build-up and compatibility |
| Hardware | Named hinges, rollers and locks | Named hinges, stays and locks |
| Installation | Fixing, sealing and drainage detail | Fixing, sealing and drainage detail |
| Maintenance | Written cleaning and warranty conditions | Written finish-care and warranty conditions |
Ask for manufacturer documentation applicable to the exact supplied assembly. A generic coating description is not evidence of whole-window performance. Do not infer lifespan, corrosion performance or energy savings from a material label. Record which party approves the specification and which party accepts the completed installation.
How to compare total window cost
Compare installed cost for the same measured opening schedule, then add documented maintenance costs over a stated period. Keep per-unit, per-metre and per-square-metre prices separate. A material price cannot establish an installed system cost without quantities, fabrication and installation scope.
| Input | Required basis |
|---|---|
| Initial cost | Confirmed quantity × quoted rate, plus separately priced work |
| Recurring cost | Documented maintenance frequency × confirmed cost per visit |
| Comparison period | The same stated period for both proposals |
Identify tax treatment, delivery, removal, disposal, access equipment and making good. For a replacement project, confirm whether the existing opening needs repairs. For custom or imported units, confirm approved drawings and lead time. Leave unknown costs explicit instead of presenting an unsupported twenty-year saving.
What to specify for exposed or unusual openings
For beachfront, oversized, replacement or heritage openings, require a project-specific specification before ordering. Record exposure, opening dimensions and approval constraints, then request the proposed system’s documented limits. No universal glass thickness, frame size or coating specification is established by this guide.
| Condition | Required decision evidence |
|---|---|
| Exposed elevation | Project exposure criteria and applicable system documentation |
| Oversized or multi-panel opening | Manufacturer size limits, glass design and support detail |
| Heritage or replacement work | Approval constraints, existing opening condition and making-good scope |
Submit an opening schedule with width and height in millimetres, quantity, opening direction, location and photographs. Ask the supplier to flag dimensions outside the proposed system’s limits and propose a documented alternative. Confirm any approval requirement before fabrication.