Skip to content
Zanzibaba.Project Solutions

Aluminium vs timber windows in Zanzibar: compare specifications before materials

Choose between aluminium and timber windows using the specified frame, finish, glazing, hardware and installation details for each opening. Material name alone does not establish price, service life or coastal suitability. Request equivalent written quotations and model-specific evidence before selecting a system.

First-party starting point: Zanzibaba’s published pricing guide, 30 September 2026; current quotes required
Published optionBudget referenceEvidence limit
Fixed glass panelFrom USD 280 per unitDimensions and final specification require quotation
Casement windowFrom USD 320 per unitNot a verified like-for-like timber comparison
Timber equivalentProject quotation requiredNo matched timber quotation dataset published here

Source: Zanzibaba pricing catalogue. These allowances are not a market survey or tested performance dataset. To compare options, use one opening schedule and require each supplier to state the frame, glass, hardware, installation and maintenance scope. Review date: 6 November 2026.

Five gaps a material-only window comparison misses

A material-only comparison cannot establish which complete window meets your project requirements. Compare the same opening sizes and request evidence for exposure, glazing, hardware, installation and maintenance. The checklist below identifies missing specification details; it does not rank suppliers or claim one material always wins.

Equivalent-scope buying checklist
GapAluminium proposalTimber proposal
Frame definitionNamed profile system and finishNamed species, section and finish
GlazingGlass build-up and frame compatibilitySame required glass build-up and compatibility
HardwareNamed hinges, rollers and locksNamed hinges, stays and locks
InstallationFixing, sealing and drainage detailFixing, sealing and drainage detail
MaintenanceWritten cleaning and warranty conditionsWritten finish-care and warranty conditions

Ask for manufacturer documentation applicable to the exact supplied assembly. A generic coating description is not evidence of whole-window performance. Do not infer lifespan, corrosion performance or energy savings from a material label. Record which party approves the specification and which party accepts the completed installation.

How to compare total window cost

Compare installed cost for the same measured opening schedule, then add documented maintenance costs over a stated period. Keep per-unit, per-metre and per-square-metre prices separate. A material price cannot establish an installed system cost without quantities, fabrication and installation scope.

Cost calculation inputs; no assumed maintenance or service-life figures
InputRequired basis
Initial costConfirmed quantity × quoted rate, plus separately priced work
Recurring costDocumented maintenance frequency × confirmed cost per visit
Comparison periodThe same stated period for both proposals

Identify tax treatment, delivery, removal, disposal, access equipment and making good. For a replacement project, confirm whether the existing opening needs repairs. For custom or imported units, confirm approved drawings and lead time. Leave unknown costs explicit instead of presenting an unsupported twenty-year saving.

What to specify for exposed or unusual openings

For beachfront, oversized, replacement or heritage openings, require a project-specific specification before ordering. Record exposure, opening dimensions and approval constraints, then request the proposed system’s documented limits. No universal glass thickness, frame size or coating specification is established by this guide.

Edge cases requiring written confirmation
ConditionRequired decision evidence
Exposed elevationProject exposure criteria and applicable system documentation
Oversized or multi-panel openingManufacturer size limits, glass design and support detail
Heritage or replacement workApproval constraints, existing opening condition and making-good scope

Submit an opening schedule with width and height in millimetres, quantity, opening direction, location and photographs. Ask the supplier to flag dimensions outside the proposed system’s limits and propose a documented alternative. Confirm any approval requirement before fabrication.