Brand-standard delivery
Fit-out executed to operator checklists, ready for flag inspections and soft opening.

Zanzibaba lists hotel & resort fit-out options for Zanzibar projects. Select the required scope, send your site location and dimensions, and request a written quotation confirming materials, installation, exclusions and delivery timing.
| Catalogue fact | Recorded value | Before ordering |
|---|---|---|
| Service categories | 6 | Select the relevant category below |
| Listed designs / service options | 15 | Confirm the design code and final specification |
| Pricing basis | Project quotation | Confirm currency, taxes, transport and installation |
These counts describe this catalogue, not stock or completed projects. Product descriptions are planning references; a written quotation and approved specification determine the supplied scope. Review pricing assumptions before comparing proposals.
Product Catalogue
Browse 6 published hotel & resort fit-out categories, then select a design or service option for a written project quotation.
| Category | Catalogue section |
|---|---|
| FF&E Packages | View listed options |
| Kitchen & Laundry | View listed options |
| Guest Rooms | View listed options |
| Common Areas | View listed options |
| MEP Coordination | View listed options |
| Quality Tiers | View listed options |
Choose an option by its design reference. Confirm dimensions, specification and availability in writing; category listings do not imply every configuration is suitable for every site.
Swipe to see more
Furnish every key
FF&E & OS&E Packages options include Complete Room Package, Suite & Villa Package, Reception & Lobby Package. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Complete Room Package (FF-001) | Beds, wardrobes, desks, minibar units, TV consoles and luggage racks — a full guest-room set built, delivered and installed per key. | Standard Room; Deluxe Room; Suite Upgrade |
| Suite & Villa Package (FF-002) | Expanded packages for suites and hotel villas — lounge seating, dining sets, coffee stations and premium finishes throughout. | Junior Suite; Presidential Suite; Hotel Villa |
| Reception & Lobby Package (FF-003) | Counters, feature walls, lounge seating and lighting details that set the arrival experience for your brand standard. | Boutique Lobby; Resort Lobby; Corporate |
| Restaurant & Bar Package (FF-004) | Tables, chairs, bar counters, stools and buffet stations — durable commercial-grade furniture for F&B outlets. | All-Day Dining; Fine Dining; Beach Bar |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Feed every guest
Kitchen, Cold & Laundry options include Commercial Kitchen Equipment, Cold Room & Dry Storage, Laundry System. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Commercial Kitchen Equipment (KL-001) | Cooking lines, extraction, prep stations and dishwashing sized to covers — specified, supplied and installed with service access. | 100 Covers; 300 Covers; Banqueting |
| Cold Room & Dry Storage (KL-002) | Walk-in cold rooms, freezers and dry stores with monitored temperatures, sealed floors and food-safety detailing. | Chiller; Freezer; Dry Store Combo |
| Laundry System (KL-003) | Commercial washers, dryers, calenders and finishing tables with steam, drainage and ventilation coordinated. | On-Premise Laundry; Linen Room; Valet Corner |
| Kitchen Joinery (KL-004) | Stainless-topped cabinets, wall cladding and storage in food-safe finishes, built around your equipment layout. | Prep Joinery; Servery Counters; Back-of-House |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Every room works
Guest Room Systems options include Key Card & Access, Minibar, Safe & Coffee, TV, Wi-Fi & AV. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Key Card & Access (GR-001) | Room key-card locks integrated with energy management and property systems — audit trails and staff zoning included. | Standalone Locks; Online System; Mobile Key |
| Minibar, Safe & Coffee (GR-002) | Minibar cabinets, room safes, kettles and coffee stations fitted and wired as one coordinated guest-room corner. | Minibar + Safe; Coffee Station; Full Corner |
| TV, Wi-Fi & AV (GR-003) | In-room TVs, casting, Wi-Fi heat-mapping and background audio — commissioned with remotes labelled and inputs locked. | Smart TV + Casting; Wi-Fi Coverage; BGM System |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Arrive and meet
Common Areas & Events options include Lobby & Reception Fit-Out, Conference & Events. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Lobby & Reception Fit-Out (CA-001) | Counters, back walls, lighting scenes and queue planning — an arrival sequence designed around check-in flow. | Boutique; Resort Scale; Business Hotel |
| Conference & Events (CA-002) | Partitioning, acoustic treatment, projection, conferencing audio and banquet furniture for meeting revenue. | Boardroom; Ballroom; Outdoor Events |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Powered and comfortable
MEP Coordination options include Electrical & Lighting Load, Plumbing, Hot Water & HVAC. Compare the listed design references and requirements below before requesting a project-specific quotation.
| Option / design code | Published description | Listed configuration choices |
|---|---|---|
| Electrical & Lighting Load (ME-001) | Distribution boards, emergency lighting, socket plans and lighting scenes coordinated with interior layouts and backup power. | Room Circuits; Emergency Lighting; Scene Control |
| Plumbing, Hot Water & HVAC (ME-002) | Hot-water recirculation, bathroom plumbing, split/VRF climate and ventilation balanced for guest comfort and energy cost. | Hot Water Rings; VRF Climate; Ventilation |
Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.
Swipe to see more
Compare written scopes before comparing totals. A supply-only proposal and an installed system answer different requirements. Use the same quantities, specification, delivery location and acceptance criteria for every quotation; ask each bidder to identify exclusions.
| Comparison gap | Evidence to request | Decision rule |
|---|---|---|
| Different quantities | Measured schedule and units | Match dimensions, counts and units |
| Different materials | Named model, grade or finish | Compare the same approved specification |
| Missing installation | Supply / install responsibility schedule | Identify labour, access and making good |
| Unclear delivery | Destination, freight and delivery programme | Confirm site access and unloading responsibility |
| Unclear handover | Inspection, testing and warranty terms | Agree acceptance evidence before ordering |
For phased works, list each mobilisation and the interface with other trades. For replacement work, identify removal and disposal. For imported or custom products, confirm approved drawings, order lead time and substitution rules before payment. These requirements belong in the quotation; they are not automatic inclusions.
One opening date
This package lists 12 scope items. Use the schedule below to request an itemised quotation; inclusion and quantities require written confirmation.
| Listed item | Order requirement |
|---|---|
| FF&E Procurement | Confirm quantity, specification and inclusion in the quotation |
| Room Packages | Confirm quantity, specification and inclusion in the quotation |
| Lobby Fit-Out | Confirm quantity, specification and inclusion in the quotation |
| Restaurant Fit-Out | Confirm quantity, specification and inclusion in the quotation |
| Commercial Kitchen | Confirm quantity, specification and inclusion in the quotation |
| Cold Rooms | Confirm quantity, specification and inclusion in the quotation |
| Laundry System | Confirm quantity, specification and inclusion in the quotation |
| Key Card Access | Confirm quantity, specification and inclusion in the quotation |
| TV & Wi-Fi | Confirm quantity, specification and inclusion in the quotation |
| MEP Coordination | Confirm quantity, specification and inclusion in the quotation |
| Backup Power Tie-In | Confirm quantity, specification and inclusion in the quotation |
| Snagging & Handover | Confirm quantity, specification and inclusion in the quotation |
Review each line against the measured project scope. Specify substitutions and exclusions before approval; a package label alone does not define the installed system.
Why open with us
Imports, trades and commissioning collide most at the end. We sequence them so nothing blocks your first booking.
Fit-out executed to operator checklists, ready for flag inspections and soft opening.
Equipment and FF&E procurement, shipping windows and site storage planned together.
Backup power, water storage and treatment sized so operations never stop.
Room-by-room snagging, as-built docs and staff training before keys transfer.
Specification tiers
Listed finish choices include Smart Budget, Standard, Premium, Luxury. Confirm the finish reference and suitability with your selected product specification.
| Finish | Approval requirement |
|---|---|
| Smart Budget | Confirm physical sample or manufacturer reference |
| Standard | Confirm physical sample or manufacturer reference |
| Premium | Confirm physical sample or manufacturer reference |
| Luxury | Confirm physical sample or manufacturer reference |
Screen colours are references for selection. Record the approved colour, texture and product compatibility in the order; confirm any exposure restrictions and maintenance conditions from the supplier documentation.
Swipe to see more
Our process
The published workflow has 4 stages: Survey & brand brief, Specification & quote, Procure & install. Agree the deliverables and approvals for your project before work starts.
| Stage | Step |
|---|---|
| 1 | Survey & brand brief |
| 2 | Specification & quote |
| 3 | Procure & install |
| 4 | Commission & open |
Use the detailed steps to agree who approves each deliverable. Establish project dates separately; a workflow stage is not a guaranteed delivery duration.
We walk the shell, capture the operator standard and list every room, outlet and plant area.
Itemised FF&E, equipment and MEP scope with fixed prices and a milestone programme.
Orders placed on shipping windows; trades installed in sequence with quality checks.
Systems tested, snags closed, staff trained and keys handed over for soft opening.
Questions
Direct answers for property owners planning this service in Zanzibar.
Typically FF&E for rooms and public areas, commercial kitchen and laundry equipment, cold rooms, key-card access, TV and Wi-Fi, plus coordinated electrical, plumbing and HVAC — commissioned to an opening date.
It depends on brand tier, room size, kitchen scale and systems scope. We provide an itemised per-key and lump-sum quotation after a free shell survey.
Yes. We execute to operator checklists and inspection regimes, with mock-up rooms signed off before bulk production and installation.
Procurement is programmed around shipping windows, with site storage, installation sequencing and commissioning planned so imports never block the opening.
Yes. Distribution, hot water, climate, backup power and containment are aligned with joinery and finishes, so nothing is chased in after the fact.
Last updated: 2026-09-30.
Keep exploring
Frequently combined with this service on the same property.
Let us take your property from concrete shell to fully equipped, guest-ready opening.
Get a free survey and quotation for hotel fit-out in Zanzibar — FF&E, kitchens, systems and handover.