Skip to content
Zanzibaba.Project Solutions
Hotel and resort technical fit-out in Zanzibar
Guest-ready delivery

Open on time, equipped to standard.

Zanzibaba lists hotel & resort fit-out options for Zanzibar projects. Select the required scope, send your site location and dimensions, and request a written quotation confirming materials, installation, exclusions and delivery timing.

Hotel & Resort Fit-Out: published catalogue scope
Catalogue factRecorded valueBefore ordering
Service categories6Select the relevant category below
Listed designs / service options15Confirm the design code and final specification
Pricing basisProject quotationConfirm currency, taxes, transport and installation

These counts describe this catalogue, not stock or completed projects. Product descriptions are planning references; a written quotation and approved specification determine the supplied scope. Review pricing assumptions before comparing proposals.

Explore Services

Product Catalogue

Explore Our Hotel & Resort Fit-Out Range

Browse 6 published hotel & resort fit-out categories, then select a design or service option for a written project quotation.

Published service categories
CategoryCatalogue section
FF&E PackagesView listed options
Kitchen & LaundryView listed options
Guest RoomsView listed options
Common AreasView listed options
MEP CoordinationView listed options
Quality TiersView listed options

Choose an option by its design reference. Confirm dimensions, specification and availability in writing; category listings do not imply every configuration is suitable for every site.

Swipe to see more

Furnish every key

FF&E & OS&E Packages

FF&E & OS&E Packages options include Complete Room Package, Suite & Villa Package, Reception & Lobby Package. Compare the listed design references and requirements below before requesting a project-specific quotation.

FF&E & OS&E Packages: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Complete Room Package (FF-001)Beds, wardrobes, desks, minibar units, TV consoles and luggage racks — a full guest-room set built, delivered and installed per key.Standard Room; Deluxe Room; Suite Upgrade
Suite & Villa Package (FF-002)Expanded packages for suites and hotel villas — lounge seating, dining sets, coffee stations and premium finishes throughout.Junior Suite; Presidential Suite; Hotel Villa
Reception & Lobby Package (FF-003)Counters, feature walls, lounge seating and lighting details that set the arrival experience for your brand standard.Boutique Lobby; Resort Lobby; Corporate
Restaurant & Bar Package (FF-004)Tables, chairs, bar counters, stools and buffet stations — durable commercial-grade furniture for F&B outlets.All-Day Dining; Fine Dining; Beach Bar

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Feed every guest

Kitchen, Cold & Laundry

Kitchen, Cold & Laundry options include Commercial Kitchen Equipment, Cold Room & Dry Storage, Laundry System. Compare the listed design references and requirements below before requesting a project-specific quotation.

Kitchen, Cold & Laundry: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Commercial Kitchen Equipment (KL-001)Cooking lines, extraction, prep stations and dishwashing sized to covers — specified, supplied and installed with service access.100 Covers; 300 Covers; Banqueting
Cold Room & Dry Storage (KL-002)Walk-in cold rooms, freezers and dry stores with monitored temperatures, sealed floors and food-safety detailing.Chiller; Freezer; Dry Store Combo
Laundry System (KL-003)Commercial washers, dryers, calenders and finishing tables with steam, drainage and ventilation coordinated.On-Premise Laundry; Linen Room; Valet Corner
Kitchen Joinery (KL-004)Stainless-topped cabinets, wall cladding and storage in food-safe finishes, built around your equipment layout.Prep Joinery; Servery Counters; Back-of-House

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Every room works

Guest Room Systems

Guest Room Systems options include Key Card & Access, Minibar, Safe & Coffee, TV, Wi-Fi & AV. Compare the listed design references and requirements below before requesting a project-specific quotation.

Guest Room Systems: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Key Card & Access (GR-001)Room key-card locks integrated with energy management and property systems — audit trails and staff zoning included.Standalone Locks; Online System; Mobile Key
Minibar, Safe & Coffee (GR-002)Minibar cabinets, room safes, kettles and coffee stations fitted and wired as one coordinated guest-room corner.Minibar + Safe; Coffee Station; Full Corner
TV, Wi-Fi & AV (GR-003)In-room TVs, casting, Wi-Fi heat-mapping and background audio — commissioned with remotes labelled and inputs locked.Smart TV + Casting; Wi-Fi Coverage; BGM System

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Arrive and meet

Common Areas & Events

Common Areas & Events options include Lobby & Reception Fit-Out, Conference & Events. Compare the listed design references and requirements below before requesting a project-specific quotation.

Common Areas & Events: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Lobby & Reception Fit-Out (CA-001)Counters, back walls, lighting scenes and queue planning — an arrival sequence designed around check-in flow.Boutique; Resort Scale; Business Hotel
Conference & Events (CA-002)Partitioning, acoustic treatment, projection, conferencing audio and banquet furniture for meeting revenue.Boardroom; Ballroom; Outdoor Events

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Powered and comfortable

MEP Coordination

MEP Coordination options include Electrical & Lighting Load, Plumbing, Hot Water & HVAC. Compare the listed design references and requirements below before requesting a project-specific quotation.

MEP Coordination: first-party catalogue references; final specifications require confirmation
Option / design codePublished descriptionListed configuration choices
Electrical & Lighting Load (ME-001)Distribution boards, emergency lighting, socket plans and lighting scenes coordinated with interior layouts and backup power.Room Circuits; Emergency Lighting; Scene Control
Plumbing, Hot Water & HVAC (ME-002)Hot-water recirculation, bathroom plumbing, split/VRF climate and ventilation balanced for guest comfort and energy cost.Hot Water Rings; VRF Climate; Ventilation

Use the design code to identify the requested option. Confirm measured quantities, material or equipment specification, installation interfaces and acceptance criteria in writing. An illustration or catalogue option does not establish tested performance, warranty cover or availability.

Swipe to see more

Why the lowest headline price can be the wrong comparison

Compare written scopes before comparing totals. A supply-only proposal and an installed system answer different requirements. Use the same quantities, specification, delivery location and acceptance criteria for every quotation; ask each bidder to identify exclusions.

Five checks for equivalent quotations; this is a buying checklist, not a competitor performance study
Comparison gapEvidence to requestDecision rule
Different quantitiesMeasured schedule and unitsMatch dimensions, counts and units
Different materialsNamed model, grade or finishCompare the same approved specification
Missing installationSupply / install responsibility scheduleIdentify labour, access and making good
Unclear deliveryDestination, freight and delivery programmeConfirm site access and unloading responsibility
Unclear handoverInspection, testing and warranty termsAgree acceptance evidence before ordering

For phased works, list each mobilisation and the interface with other trades. For replacement work, identify removal and disposal. For imported or custom products, confirm approved drawings, order lead time and substitution rules before payment. These requirements belong in the quotation; they are not automatic inclusions.

One opening date

Complete Hotel Opening Package

This package lists 12 scope items. Use the schedule below to request an itemised quotation; inclusion and quantities require written confirmation.

Published package checklist
Listed itemOrder requirement
FF&E ProcurementConfirm quantity, specification and inclusion in the quotation
Room PackagesConfirm quantity, specification and inclusion in the quotation
Lobby Fit-OutConfirm quantity, specification and inclusion in the quotation
Restaurant Fit-OutConfirm quantity, specification and inclusion in the quotation
Commercial KitchenConfirm quantity, specification and inclusion in the quotation
Cold RoomsConfirm quantity, specification and inclusion in the quotation
Laundry SystemConfirm quantity, specification and inclusion in the quotation
Key Card AccessConfirm quantity, specification and inclusion in the quotation
TV & Wi-FiConfirm quantity, specification and inclusion in the quotation
MEP CoordinationConfirm quantity, specification and inclusion in the quotation
Backup Power Tie-InConfirm quantity, specification and inclusion in the quotation
Snagging & HandoverConfirm quantity, specification and inclusion in the quotation

Review each line against the measured project scope. Specify substitutions and exclusions before approval; a package label alone does not define the installed system.

FF&E Procurement
Room Packages
Lobby Fit-Out
Restaurant Fit-Out
Commercial Kitchen
Cold Rooms
Laundry System
Key Card Access
TV & Wi-Fi
MEP Coordination
Backup Power Tie-In
Snagging & Handover

Why open with us

One team, one opening date.

Imports, trades and commissioning collide most at the end. We sequence them so nothing blocks your first booking.

Brand-standard delivery

Fit-out executed to operator checklists, ready for flag inspections and soft opening.

Import coordination

Equipment and FF&E procurement, shipping windows and site storage planned together.

ZECO-proof systems

Backup power, water storage and treatment sized so operations never stop.

Snag-to-handover

Room-by-room snagging, as-built docs and staff training before keys transfer.

Specification tiers

Fit-Out Quality Tiers

Listed finish choices include Smart Budget, Standard, Premium, Luxury. Confirm the finish reference and suitability with your selected product specification.

Published finish references
FinishApproval requirement
Smart BudgetConfirm physical sample or manufacturer reference
StandardConfirm physical sample or manufacturer reference
PremiumConfirm physical sample or manufacturer reference
LuxuryConfirm physical sample or manufacturer reference

Screen colours are references for selection. Record the approved colour, texture and product compatibility in the order; confirm any exposure restrictions and maintenance conditions from the supplier documentation.

Smart budget tier

Smart Budget

Standard tier

Standard

Premium tier

Premium

Luxury tier

Luxury

Swipe to see more

Our process

From shell to first guest

The published workflow has 4 stages: Survey & brand brief, Specification & quote, Procure & install. Agree the deliverables and approvals for your project before work starts.

Published process stages
StageStep
1Survey & brand brief
2Specification & quote
3Procure & install
4Commission & open

Use the detailed steps to agree who approves each deliverable. Establish project dates separately; a workflow stage is not a guaranteed delivery duration.

  1. 01

    Survey & brand brief

    We walk the shell, capture the operator standard and list every room, outlet and plant area.

  2. 02

    Specification & quote

    Itemised FF&E, equipment and MEP scope with fixed prices and a milestone programme.

  3. 03

    Procure & install

    Orders placed on shipping windows; trades installed in sequence with quality checks.

  4. 04

    Commission & open

    Systems tested, snags closed, staff trained and keys handed over for soft opening.

Questions

Common Questions About Hotel & Resort Fit-Out

Direct answers for property owners planning this service in Zanzibar.

What does a hotel fit-out include?

Typically FF&E for rooms and public areas, commercial kitchen and laundry equipment, cold rooms, key-card access, TV and Wi-Fi, plus coordinated electrical, plumbing and HVAC — commissioned to an opening date.

How much does hotel fit-out cost per room in Zanzibar?

It depends on brand tier, room size, kitchen scale and systems scope. We provide an itemised per-key and lump-sum quotation after a free shell survey.

Can you work to an international brand standard?

Yes. We execute to operator checklists and inspection regimes, with mock-up rooms signed off before bulk production and installation.

How do you handle equipment imports?

Procurement is programmed around shipping windows, with site storage, installation sequencing and commissioning planned so imports never block the opening.

Do you coordinate MEP with interiors?

Yes. Distribution, hot water, climate, backup power and containment are aligned with joinery and finishes, so nothing is chased in after the fact.

Last updated: 2026-09-30.

Opening a Hotel or Resort?

Let us take your property from concrete shell to fully equipped, guest-ready opening.

Ready to Fit Out Your Hotel?

Get a free survey and quotation for hotel fit-out in Zanzibar — FF&E, kitchens, systems and handover.